Services
Kitchen and bath remodels, additions, decks and repair.
Every job gets one project lead, a written scope and a Friday update.
01Kitchens
Cabinets, counters, lighting and layout changes, from a refresh to taking the room down to the studs.
What is included
- Layout and cabinet plan drawn with you
- Cabinets, counters, backsplash and hardware
- Electrical, lighting and plumbing moves
- Flooring and trim to finish the room
Most kitchens take 8 to 12 weeks once work starts.
02Baths
Showers, tubs, tile and vanities, built so water goes where it should for a long time.
What is included
- Waterproofing under every wet wall and floor
- Tile set straight, with clean corners and grout lines
- Vanity, fixtures and ventilation
- Lighting and mirrors placed for daily use
A full bath usually takes 4 to 6 weeks.
03Room additions
A new bedroom, suite or family room that looks like it was always part of the house.
What is included
- Plans and permits handled with your designer or ours
- Foundation, framing and roof tied into the house
- Windows, siding and trim matched to what you have
- Inside finishes to match the rest of the home
Additions run 4 to 6 months, depending on size and permits.
04Decks
Redwood and composite decks, stairs and railings, built level and solid.
What is included
- Footings and framing sized for the span
- Boards, stairs and railings
- Cable, wood or glass railing options
- Lighting and steps to the yard
Most decks take 2 to 4 weeks.
05Storm and water repair
Quick, careful repair after storms, leaks or water damage, with photos and a written scope for your insurance.
What is included
- Dry-out check and moisture readings
- Cut-out and replacement of damaged drywall, framing and floors
- Photos and a written scope for your claim
- Finishes put back to match
Small repairs can start within days. Larger ones get a written scope first.
Questions
Straight answers.
Do you pull the permits?
Yes. We file and track the permits for every job that needs one, and we schedule the inspections.
How long does a kitchen take?
Most kitchens take 8 to 12 weeks once work starts. Your written scope has the dates.
What is in the written scope?
What we will build, the materials and finishes, who does what, and the schedule. If something changes, the scope changes in writing first.
What if you find a surprise behind a wall?
We stop, show you, and write down the fix and what it adds before we go on. For example: we found old wiring behind the wall. Here is the fix and what it adds.
Can we live at home during the work?
Usually, yes. We seal off the work area, keep a clear path, and clean up at the end of every day.
Are you licensed and insured?
Yes. Our license and insurance details are listed on the estimate page.